FUND TRANSFERS
*9.5 hours=570 minutes
*10 minutes loading time per truck=57 trucks
*57 trucks X $1.5 billion capacity=$85.5 billion
*8 hours=240 truck loads[20 minutes loading]=$360 billion
18:30 to 06:30=12.5 hours=750 minutes
*10 minutes loading time=75 trucks
*75 trucks X $1.5 billion=$112.5 billion
*12.5 ours=375 truck loads=$562.5 billion
4 trucks simultaneously loaded=$449 billion per 24 hour period
14’ long vans=4 vans per 18 wheeler box[456’]
50 trucks X 60 cases[attaché-$2 million]=600 million
5 trucks simultaneously=$10 milion
170 trucks=$340 million
4” stack of $100 bills:
*$23,200
*58’L X 8’W X 8’H=96” X 96” X 96”
*$1,550,131,200
*1,935 truck loads
No comments:
Post a Comment